Re: How many framebuilders would do production work?
I worked for a few years building about 90% mass production level BMX frames, bars, and cranks for both our house brand and about ten other brands.
We would work anywhere from batches of 5 to about 200 at a time, usually breaking it up into 3 to 5 different top tube lengths (the preferred measurement of BMX frames) in any given run. Depending on the material used, (a lot of frames were built with straight gauge .035" or .049" chromoly front triangles) we would chop our main tubes to size, bend to rear end pieces (also straight gauge chromoly), and setup for mitering everything on two vertical mills. After all of that, everything would be racked and ready to weld.
With four to five people on the floor, we could manage the latter amount in a little over a month.
It was tough at times when you rely on sheer numbers to make a profit, but nonetheless still a good learning experience.
Albie D. Ish IV
- Seattle Based Metal Fabricator
- Enthusiastic Alternative Learner
Bookmarks