Originally Posted by
briordon
Thanks e-RICHIE for posting these...these photos are really informative.
I'm trying to understand the differences between your main triangle assembly process flow and the way I've put things together. It seems to me like your approach is more streamlined. My (simplified) flow uses subassemblies:
miter downtube and seat tube
tack headtube/down tube in fixture then braze
tack seattube/BB in fixture (then inspect), then braze
tack BB/downtube in fixture and inspect HT/ST/BB parallelism
Miter toptube to fit and braze
Your process aligns and brazes the BB last. Did you always do it this way? Did you ever use my type of approach?
Thanks again,
Ben
Bookmarks